<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=294581992215478&amp;ev=PageView&amp;noscript=1">

CASE STUDY #169

New Depot for the Shire of Tammin

New Depot for the Shire of Tammin

02 JUNE 2015 Case Study # 169
PROJECT VALUE: $250k-$500k
PROJECT BUILD TIME: 8 WEEKS

CLIENT BRIEF

The Shire of Tammin called a design & construct tender for their new depot - the council needed an industrial building for the storage and maintenence of their equipment. Also required was a bullnose lean-to structure to facilitate the construction of their offices.

CHALLENGES

AUSPAN SOLUTIONS

FEATURES

  • Double track sliding door system to both sides of depot giving excellent access for equipment storage and servicing.
  • Internal wall to separate the machinery storage area and the servicing workshop.
  • AUSPAN’s custom designed tapered gutter system.

CLIENT TESTIMONIAL

AUSPANS TESTIMONIAL

What Are you waiting for?

Your Building Project Simplified.
On Time & Delivered Right. Created Uniquely for YOU.

image (1)-1
RUSSEL MILLER COMMERCIAL BUILDING MANAGER