<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=294581992215478&amp;ev=PageView&amp;noscript=1">

CASE STUDY #546

Moora Citrus Packing Shed and Covered Loading Facility

Moora Citrus Packing Shed and Covered Loading Facility

03 APRIL 2018 Case Study # 546
PROJECT VALUE: $1000 - $1250K
PROJECT BUILD TIME: 8 WEEKS

CLIENT BRIEF

Following up on a recommendation, GSD Architects approached AUSPAN to assist with the design and construction of this impressive packing shed and covered loading facility. As the project progressed, this also involved working with Shane Kay the manager of Moora Citrus to make sure all their requirements were considered for a successful build..

CHALLENGES

AUSPAN SOLUTIONS

FEATURES

  • 6225m² of floor space - The largest citrus packing facility in Western Australia

  • 40m Clear span to allow efficient machinery operation and storage
    • Covered loading and unloading area
  • Utilises the existing shed by sealing up against it and opening between to allow free access
  • Insulated roof and ridge vent to maintain a good working environment.

CLIENT TESTIMONIAL

AUSPANS TESTIMONIAL

What Are you waiting for?

Your Building Project Simplified.
On Time & Delivered Right. Created Uniquely for YOU.

image (1)-1
RUSSEL MILLER COMMERCIAL BUILDING MANAGER